How long does a kitchen remodel take?

Most kitchen remodels take a few weeks for a cosmetic update and roughly 6 to 12 weeks of on-site work for a full remodel. Planning, permits and cabinet lead times can add several more weeks before work starts. A quote from a local licensed partner contractor gives the timeline for your kitchen.

Request a kitchen quote

Quotes provided by our network of licensed, insured local contractors to get you top quality at a fair price.

Typical timeline by project size

  1. Cosmetic refresh: often a few weeks. Think paint, hardware, a new backsplash or counters on the existing layout.
  2. Mid-range update: commonly about 4 to 8 weeks on site. New cabinets and counters, flooring and fixtures, with the layout kept.
  3. Full remodel: roughly 6 to 12 weeks on site, and longer if walls, plumbing or the layout move.

These are typical ranges, not promises. Planning, permits and cabinet orders can add several weeks before the first day on site.

The phases, step by step

  1. Planning and design. Decide the layout, cabinets, counters and appliances you want.
  2. Quotes and contract. Compare quotes from local licensed pros and agree on scope and schedule.
  3. Permits. Your partner contractor checks whether the work may need a permit.
  4. Ordering materials. Cabinets, counters and appliances are ordered; cabinet lead times are often the longest wait.
  5. Demolition. Old cabinets, counters and flooring come out.
  6. Rough-in and inspections. Plumbing and electrical work is roughed in and inspected where required.
  7. Installation. Cabinets, counters, backsplash, flooring and fixtures go in.
  8. Finishing and final walkthrough. Touch-ups, cleanup and a walkthrough with your partner contractor.

What can stretch the schedule

  • Custom or semi-custom cabinets with long lead times
  • Layout changes that move plumbing, electrical or walls
  • Inspections that have to be scheduled between steps
  • Back-ordered materials or appliances
  • Surprises behind walls, such as old wiring or water damage

Living through a kitchen remodel

Plan for the kitchen to be out of use for several weeks. A few things help:

  • Set up a temporary kitchen with a microwave, a small fridge and a slow cooker or hot plate.
  • Use paper plates and a tub for rinsing dishes, or a bathroom or laundry sink.
  • Pack away what you do not need so it stays out of the dust.
  • Ask your partner contractor which days will be loudest and when water or power may be off.

Related

Kitchen remodel FAQs

Do I need a permit for a kitchen remodel in Rochester?

Often, when plumbing, electrical or structural work is involved. Requirements may vary by project, so your partner contractor confirms what applies with the City of Rochester before work starts.

Can I use my kitchen during the remodel?

Usually not during demolition and installation. Many homeowners set up a temporary kitchen in another room for the weeks the space is out of use.

How long do new cabinets take to arrive?

Lead times may range from a couple of weeks for stock cabinets to several weeks or more for semi-custom and custom orders. Your partner contractor can confirm current lead times when quoting.

Does a small kitchen take less time?

Often, because there is less to demolish and install. Cabinet lead times, permits and inspections can still take about the same amount of time, so a small kitchen is not always dramatically faster.